Ziesing Electrical Photo Gallery

  • Home
  • Services
  • Electrical design
  • Gallery
  • About us
  • Blog
  • FAQS
  • Join Our Team
  • Residential/Domestic
  • Commercial
  • Industrial & Projects
  • Repairs and Maintenance
  • Special offers
Get in touch

ziesingelectrical@gmail.com
0492 991 706

REC 37125

ABN 60 688 697 805


Logo: Ziesing Electrical (ZE) — professional electrician branding for switchboards and lighting.
Contact us
Ziesing Electrical logo — bold ZE emblem and company name for electrical services Hampton

REC 37125

ABN 60 688 697 805     

  • Home
  • Services
  • Electrical design
  • Gallery
  • About us
  • Blog
  • FAQS
  • Join Our Team
  • Residential/Domestic
  • Commercial
  • Industrial & Projects
  • Repairs and Maintenance
  • Special offers
  • 3 separate apartments completed, out with the old and in with the new ?
    3 separate apartments completed, out with the old and in with the new 🆕
    Button
  • Single phase board upgrade completed
    Single phase board upgrade completed
    Button
  • LED installation completed
    LED installation completed
    Button
  • Rough in for down lights completed
    Rough in for down lights completed
    Button
  • 4 different lights installed
    4 different lights installed
    Button
  • LED batten installed into garage
    LED batten installed into garage
    Button
  • 3 pendant power points and 2 DGPOS ran and spray painted black for computer desk area, with a C16A RCBO installed for safety
    3 pendant power points and 2 DGPOS ran and spray painted black for computer desk area, with a C16A RCBO installed for safety
    Button
  • Biggest job finished, 8 apartments completed with gpo and light upgrades including range hood power
    Biggest job finished, 8 apartments completed with gpo and light upgrades including range hood power
    Button
  • Little Saturday job, half way finished, still need to run power down and spray paint cables and j-boxs black for a great finish
    Little Saturday job, half way finished, still need to run power down and spray paint cables and j-boxs black for a great finish
    Button
  • Installed and supplied flood light and 2 GPOS
    Installed and supplied flood light and 2 GPOS
    Button
  • Oyster light supplied and installed
    Oyster light supplied and installed
    Button
  • 2 down-lights on a swivel, installed with 2 dimmers
    2 down-lights on a swivel, installed with 2 dimmers
    Button
  • Hoodies have arrived
    Hoodies have arrived
    Button
  • Kitchen renovation completed
    Kitchen renovation completed
    Button
  • 3 outside lights installed
    3 outside lights installed
    Button
  • Few installs for the day
    Few installs for the day
    Button
  • Fancy wall light, plus 2 weather proof gpos plus some light dimmers
    Fancy wall light, plus 2 weather proof gpos plus some light dimmers
    Button
  • Ziesing electrical
    Ziesing electrical
    Button
  • Oven light fixed
    Oven light fixed
    Button
  • Electrical completed
    Electrical completed
    Button
  • Swapping sensor, changing 2 led transformers, fault finding garden lights
    Swapping sensor, changing 2 led transformers, fault finding garden lights
    Button
  • 3 new downlights added plus 1 DGPO
    3 new downlights added plus 1 DGPO
    Button
  • Swapping with 3 new dimmers plus switch
    Swapping with 3 new dimmers plus switch
    Button
  • Ev charger added, plus power point in board
    Ev charger added, plus power point in board
    Button
  • Heat lamp and light installed
    Heat lamp and light installed
    Button
  • Electrical complete in Geelong
    Electrical complete in Geelong
    Button
  • Button
  • Apartment 5 & 6 finished
    Apartment 5 & 6 finished
    Button
  • Door bell, gate control, 35m trench, 2 weather proof gpos all installed
    Door bell, gate control, 35m trench, 2 weather proof gpos all installed
    Button
  • Swapped out faulty RCD
    Swapped out faulty RCD
    Button
  • NBN conduit installed
    NBN conduit installed
    Button
  • 35m of trench, boys killed it over the last 2 days, jobs only half finished ✅
    35m of trench, boys killed it over the last 2 days, jobs only half finished ✅
    Button
  • Down lights installed
    Down lights installed
    Button
  • Fit off completed
    Fit off completed
    Button
  • Fit off complete
    Fit off complete
    Button
  • Two smoke detectors installed
    Two smoke detectors installed
    Button
  • Double insulated lights installed
    Double insulated lights installed
    Button
  • Blind cable installed
    Blind cable installed
    Button
  • Dedicated circuit for two 9amp each sandwich presses
    Dedicated circuit for two 9amp each sandwich presses
    Button
  • EV charger installed
    EV charger installed
    Button
  • 3 power points and 32A main breaker installed
    3 power points and 32A main breaker installed
    Button
  • 2 down lights changed plus smoke detector
    2 down lights changed plus smoke detector
    Button
  • Power point installed
    Power point installed
    Button
  • Bug zapper installed
    Bug zapper installed
    Button
  • 1 double GPO ran and installed
    1 double GPO ran and installed
    Button
  • Roof disconnection
    Roof disconnection
    Button
  • Down lights added
    Down lights added
    Button
  • 20A socket run for coffee machine
    20A socket run for coffee machine
    Button
  • Surge protector added and pool board energised
    Surge protector added and pool board energised
    Button
  • Fit off complete
    Fit off complete
    Button
  • Swan hill upgrading the electrical installation
    Swan hill upgrading the electrical installation
    Button
  • Swan hill, 3 board upgrades completed ?
    Swan hill, 3 board upgrades completed 😍
    Button
  • 1 apartment completed
    1 apartment completed
    Button
  • Few jobs completed today
    Few jobs completed today
    Button
  • Amazing looking track lights installed
    Amazing looking track lights installed
    Button
  • Fit off
    Fit off
    Button
  • Ziesing electrical
    Ziesing electrical
    Button
  • Flood light
    Flood light
    Button
  • NBN all set up
    NBN all set up
    Button
  • NBN installed
    NBN installed
    Button
  • Fault finding because the fans were tripping out, all fixed plus 3 power points and a brush plate
    Fault finding because the fans were tripping out, all fixed plus 3 power points and a brush plate
    Button
  • LED light installed
    LED light installed
    Button
  • Ziesing electrical
    Ziesing electrical
    Button
  • Ziesing electrical
    Ziesing electrical
    Button
  • Bathroom renovation
    Bathroom renovation
    Button
  • Fit off and range hood done
    Fit off and range hood done
    Button
  • Big install day, putting in an amazing looking pendant light, 2 led mirrors, 2 marble stone front lights, plus a sensor flood light and a few flood lights.

Everything came out looking perfect ?
    Big install day, putting in an amazing looking pendant light, 2 led mirrors, 2 marble stone front lights, plus a sensor flood light and a few flood lights. Everything came out looking perfect 🤩
    Button
  • Ziesing electrical
    Ziesing electrical
    Button
  • Ziesing electrical
    Ziesing electrical
    Button
  • Board upgrade and oven installed
    Board upgrade and oven installed
    Button
  • Exhaust fan change
    Exhaust fan change
    Button
  • Uniform is in
    Uniform is in
    Button
  • Board finished and inspection done
    Board finished and inspection done
    Button
  • Lights installed
    Lights installed
    Button
  • Ziesing electrical
    Ziesing electrical
    Button
  • Old breakers out RCBO IN
    Old breakers out RCBO IN
    Button
  • Power point added
    Power point added
    Button
  • Board upgrade completed
    Board upgrade completed
    Button
  • Electrical work finished
    Electrical work finished
    Button
  • Garage job all finished and working beautifully
    Garage job all finished and working beautifully
    Button
  • Little update of the day
    Little update of the day
    Button
  • Painters coming in to do finishing touches
    Painters coming in to do finishing touches
    Button
  • Weather proof gpo
    Weather proof gpo
    Button
  • Little giant doing wonders, changing downlights, oysters and smoke detectors
    Little giant doing wonders, changing downlights, oysters and smoke detectors
    Button
  • Fit off, waiting on painter to come through
    Fit off, waiting on painter to come through
    Button
  • More complete
    More complete
    Button
  • Lakes entrance completed
    Lakes entrance completed
    Button
  • Lakes entrance job ?
    Lakes entrance job 😁
    Button
  • Power run
    Power run
    Button
  • Rough in complete
    Rough in complete
    Button
  • New oyster light installed
    New oyster light installed
    Button
  • New LED batten light
    New LED batten light
    Button
  • In with the new out with the old
    In with the new out with the old
    Button
  • Ziesing electrical
    Ziesing electrical
    Button
  • Adding a buzz bar for a fault find
    Adding a buzz bar for a fault find
    Button
  • Swap over
    Swap over
    Button
  • Lights on
    Lights on
    Button
  • A little bit of work
    A little bit of work
    Button
  • Trench run
    Trench run
    Button
  • Live cable made safe
    Live cable made safe
    Button

Ziesing Electrical company logo for branding on vehicles and marketing materials.
Privacy Policy Terms and Conditions Our Service Areas

Contact Info

0492 991 706

ziesingelectrical@gmail.com


JOIN OUR TEAM








Share by: